The Importance of Agility in Emergency Response

4 min. Read • Posted 10/26/2020 by Monique Fuhrman, P.E.

Iteris Supports San Francisco Bay Area Metropolitan Transportation Commission’s 511 Emergency Response During NorCal Fires

>> CLICK TO ACCESS FULL WHITE PAPER <<

The Emergency

California has been experiencing very active fire “seasons” the past several years, and 2020 was no different with a season beginning earlier than expected. An unusual weather event composed of uncharacteristic lightning storms struck the San Francisco Bay Area in Northern California, igniting several very large, aggressive wildfires: The LNU Lightning Complex fire, the SCU Lighting Complex fire, and the CZU Lighting Complex fire. These fires affected seven of the nine Bay Area counties by varying degrees, impacting up to 80% of Bay Area residents.

Traffic on Golden Gate bridge

Smoke from northern California wildfires turn the sky orange as cars cross the San Francisco Golden Gate Bridge from Lime Point.


What Happened

As these fires spread in several counties, the 511 SF Bay operation, which is historically a primary source for transportation information in the region’s nine counties, began to ramp up messaging related to the various fires, including road closures. This information was pushed to the public via Bay Area’s 511 dissemination channels including: the 511.org website, 511 phone, social media including Twitter, and emergency SMS alerts. The need for this operation’s important messaging continued to grow as the fire spread escalated and began to impact more densely populated areas, including portions of Interstate 80 and multiple state roadways.

To provide the most accurate and timely information, 511 SF Bay’s operation began the arduous process of compiling road closure information from the various agencies around the Bay Area, in addition to the normal traffic and transit information that is typically shared via the 511 traveler information system. This includes, but is not limited to: reviewing California Highway Patrol (CHP) websites, maps and Twitter feeds for updated closure information; reviewing various county road closure geographic information system, or GIS, maps; reviewing County-disseminated Nixle alerts; reviewing the Twitter feeds of the various Cal Fire command units; communicating with Caltrans Transportation Management Center (TMC) staff regarding closures; and, of course, disseminating all of this information in a timely manner to the public via the 511 dissemination channels.

Download the whitepaper

As the fires grew and road closures began to grow exponentially, the operation increased staffing and coverage of the program on extended schedule from 4:00 a.m. to midnight seven days a week (normal operations are 5:00 a.m. to 9:00 p.m. on weekdays, and 10:00 a.m. to 6:00 p.m. on weekends). Without this additional staffing, it would not have been impossible for all of the necessary information, which was constantly updated, to be validated and disseminated while also maintaining the regular traffic and transit incident monitoring. This was Iteris’ cue to jump in and augment the 511 team.


Key Takeaway

To best prepare for an emergency like this, agencies should establish a communication protocol for sharing important transportation-related information with the public. Tools like 511 systems, GIS maps, Nixle alerts, and Twitter are very effective ways to disseminate roadway information and safety information for users. Agencies should also consider coordination among partner and surrounding agencies to consolidate and match data sharing strategies, which may make user access to available information that much easier. Further, establishing response mechanisms and tools that are cloud-based allows for agile response to emergencies, which allows the Public to have access to key information when it’s needed most.


Access Our Full Analysis

For our full analysis of the unique challenges MTC faced and how Iteris supported its 511 emergency response, download our white paper.

Please also visit our spotlight on emergency response page, which features resources related to smart mobility solutions for public safety.


About the Author

Monique Fuhrman

Monique Fuhrman is a senior engineer for Iteris’ Transportation Systems division and has been with Iteris since October 2019. Monique has 10 years of experience working in the fields of traffic operations, traffic engineering, transportation design and planning, intelligent transportation systems design and planning, public works engineering, and civil site engineering. Monique serves as deputy project manager for the Iteris 511 and Express Lanes Contract.

Connect with Monique on LinkedIn.

About the Author

Monique Fuhrman, P.E. is senior manager, mobility professional services at Iteris.

Connect with Monique Fuhrman, P.E. on LinkedIn

Related Posts

How is Iteris Making Construction Zones Safe and Efficient?

2 min. Read • Posted 11/21/2024 by Breanna Wallace
Work zone crashes are a serious concern. In 2022, the National Safety Council reported that 891 people were killed and 37,701 were injured in these crashes, with the highest percentage of fatalities happening in construction zones.See More >

How is Iteris Reducing Traffic Congestion?

2 min. Read • Posted 11/13/2024 by Breanna Wallace
Ever wonder why traffic congestion can get so bad? The common culprit is signal timing issues, leading to long delays, increased fuel consumption, and a frustrated traveling public.See More >

How is Iteris Preventing Red-Light Running Crashes?

2 min. Read • Posted 11/07/2024 by Breanna Wallace
Did you know that a staggering 31% of drivers admitted to running a red light within the last month in a 2019 AAA survey? See More >

Subscribe to Our Newsletter

Receive smart mobility news and analysis direct to your inbox.